Sunday, 19 May 2024
 
 
Network Rail – Cowlairs

Network-Rail-CowlairsProject Name: Network Rail – Cowlairs

Date of Completion: October 2008

Project Size: m2

Building Profile: A new central office and break out area for Network Rail at the ‘Turkey Yard’ on the outskirts of Glasgow. The building comprises of a large open office area, smaller individual management offices, a rest area and a large changing and locker area.

System Application: An unarmoured lighting and armoured power system were used on this project. The lighting is controlled predominantly by absence and presence detection with individual switching in the small offices. The power system fed all air con and FCU’s along with small power and floor boxes. Due to the building profile, many of the socket and switch drops were non standard lengths and all underfloor power were fed from the floor below as there was no floor void. Modular Wiring Systems Limited completed a supply and installation package on the project.